Skip to main content

Answer · Objections and fixes

How do you submit a replacement drawing sheet?

Submit the whole sheet again, including any figures on it that did not change, with the words 'Replacement Sheet' in the top margin. It keeps its original sheet number. In your reply, explain the changes. If the examiner asks for it, also file an annotated copy of the old sheet, marked 'Annotated Sheet Showing Changes', with the changes marked.

Example, drawn by the same code and layout as your figures.
Example, drawn by the same code and layout as your figures.

Draw this figure on a filing sheet

Upload a photo, sketch or CAD screenshot, or describe a method. You get black-and-white drawings with editable numerals on USPTO, EPO or PCT sheets. $19 for 40 drawings, one-time.

Open the drawing tool

The details

Whole sheet, not one figure

Even if only FIG. 3 changed, the replacement sheet shows every figure that was on that sheet.

New sheets

A sheet with only new figures is labeled 'New Sheet' and numbered in sequence.

No new matter

Changes must show only what the original application already disclosed.

Questions people also ask

Can the label go in the drawing area?

It goes in the top margin, one of the few things allowed there.

Do I resubmit all sheets?

Only the sheets that change, unless the examiner asks for a complete set.

Can the tool add the label?

The tool exports standard sheets without the label. Add 'Replacement Sheet' to the top margin of the PDF in a PDF editor before filing.

Official sources

Related questions

More in Objections and fixes

Draw this figure on a filing sheet

Upload a photo, sketch or CAD screenshot, or describe a method. You get black-and-white drawings with editable numerals on USPTO, EPO or PCT sheets. $19 for 40 drawings, one-time.

Open the drawing tool

Patent drawing generatorThis page explains public rules and our tool. It is not legal advice; ask a registered patent attorney or agent about your application.