Skip to main content

Answer · Drawing requirements

When do you label figures 1A and 1B?

37 CFR 1.84(u)(1) reserves letter suffixes for partial views meant to form one complete view: they take the same number plus a capital letter: FIG. 1A, FIG. 1B. Other views get their own consecutive Arabic numbers. Many issued patents also use letters for closely related views, which is a drafting choice your practitioner makes. PatentDrawingsAI draws each view in minutes and renumbers figures on export, with 40 drawings at $19.

Example, drawn by the same code and layout as your figures.
Example, drawn by the same code and layout as your figures.

Draw this figure on a filing sheet

Upload a photo, sketch or CAD screenshot, or describe a method. You get black-and-white drawings with editable numerals on USPTO, EPO or PCT sheets. $19 for 40 drawings, one-time.

Open the drawing tool

The details

The rule's case

A flowchart or machine too large for one sheet is split into FIG. 3A and FIG. 3B, which together form FIG. 3. That is the use the rule describes.

Separate views get numbers

A section, a detail and an exploded view are distinct views and normally get their own numbers, such as FIG. 4, FIG. 5 and FIG. 6.

Enlarged views

Under 1.84(h)(2) a magnified portion counts as its own view with its own label, so a detail of FIG. 2 is not simply FIG. 2 again.

Format of the label

Use "FIG." with an Arabic numeral and a capital letter, without brackets or circles. View numbers must be larger than reference numerals under 1.84(u)(2).

Description must match

The brief description of the drawings lists each lettered view, for example "FIGS. 3A and 3B together show a flowchart of the method".

Common mistakes

  • Lower-case letters such as FIG. 1a
  • Using FIG. 1A when there is no FIG. 1B
  • Skipping numbers to keep letters grouped

Questions people also ask

Can I have FIG. 1 and FIG. 1A?

It appears in issued patents, but it blurs the partial-view meaning; a separate number is clearer.

Do lettered views have to be on the same sheet?

No. Partial views can run across several sheets, which is often why they exist.

Will reordering figures break the labels?

The export renumbers FIG. labels in order, so update the text to match.

Official sources

Related questions

More in Drawing requirements

Draw this figure on a filing sheet

Upload a photo, sketch or CAD screenshot, or describe a method. You get black-and-white drawings with editable numerals on USPTO, EPO or PCT sheets. $19 for 40 drawings, one-time.

Open the drawing tool

Patent drawing generatorThis page explains public rules and our tool. It is not legal advice; ask a registered patent attorney or agent about your application.