Skip to main content

Answer · Costs

How much does a utility patent cost?

Through grant, the core USPTO fees for a utility patent are $3,290 for a large entity, $1,246 for a small entity filing electronically and $658 for a micro entity, per the schedule revised November 1, 2026. Keeping it in force adds maintenance fees at 3.5, 7.5 and 11.5 years. Attorney and drawing costs are separate; here, figures are drawn in minutes and a pack of 40 is $19 one-time.

Example, drawn by the same code and layout as your figures.
Example, drawn by the same code and layout as your figures.

Draw this figure on a filing sheet

Upload a photo, sketch or CAD screenshot, or describe a method. You get black-and-white drawings with editable numerals on USPTO, EPO or PCT sheets. $19 for 40 drawings, one-time.

Open the drawing tool

The details

Fees due when you file

Basic filing fee 37 CFR 1.16(a): $350 large, $70 small (electronic), $70 micro. Utility search fee 1.16(k): $770 / $308 / $154. Utility examination fee 1.16(o): $880 / $352 / $176.

Fee due at allowance

Utility issue fee 1.18(a): $1,290 large, $516 small, $258 micro. Publication of the application carries a $0 fee on the current schedule.

Maintenance over the term

1.20(e) at 3.5 years: $2,150 / $860 / $430. 1.20(f) at 7.5 years: $4,040 / $1,616 / $808. 1.20(g) at 11.5 years: $8,280 / $3,312 / $1,656. Missing one lets the patent expire early.

Surcharges that depend on your draft

Each independent claim beyond three, 1.16(h), is $600 large; each claim beyond 20, 1.16(i), is $200 large. Filing the specification in a format other than DOCX adds the 1.16(u) surcharge of $430 large / $172 small / $86 micro.

Drawing pages and the size fee

When specification and drawings together exceed 100 sheets, 1.16(s) charges $450 large for each further 50 sheets. Ordinary filings with 5 to 15 drawing sheets stay well under that line.

Common mistakes

  • Filing on paper: the 1.16(t) non-electronic fee adds $400 for a large entity and $200 for small or micro.
  • Adding claims late without checking the excess-claim fees.
  • Budgeting only to grant and forgetting the 3.5-year maintenance fee.

Questions people also ask

What is the minimum due on filing day?

Filing, search and examination together: $2,000 large, $730 small filing electronically, $400 micro, before any excess-claim or format surcharges.

How long does a utility patent last?

20 years from the earliest US nonprovisional filing date it claims, provided the maintenance fees are paid.

Are drawings a separate USPTO fee?

No. Drawing sheets only matter for fees if the whole application passes 100 sheets; what you pay for drawings is the cost of making them.

What do the figures cost on this site?

One credit each: $19 for 40, $39 for 120, $79 for 300, valid 12 months and paid once.

Official sources

Related questions

More in Costs

Draw this figure on a filing sheet

Upload a photo, sketch or CAD screenshot, or describe a method. You get black-and-white drawings with editable numerals on USPTO, EPO or PCT sheets. $19 for 40 drawings, one-time.

Open the drawing tool

Patent drawing generatorThis page explains public rules and our tool. It is not legal advice; ask a registered patent attorney or agent about your application.